CDM 2015 Regulations Explained: Complete Guide for UK Tradespeople
Understanding Construction Design and Management Regulations 2015 and your legal duties as a contractor
The Construction (Design and Management) Regulations 2015—commonly known as CDM 2015—are the primary health and safety regulations for construction work in the UK. If you're a tradesperson working on commercial sites, domestic projects, or managing construction work, CDM 2015 directly affects you.
Unlike the previous 2007 regulations, CDM 2015 simplified many requirements and extended duties to a broader range of projects. Whether you're an electrician, plumber, builder, or scaffolder, understanding these regulations is essential to working legally and avoiding HSE enforcement action.
This guide breaks down CDM 2015 in plain English: who it applies to, what your specific duties are, and how to demonstrate compliance.
Need CDM 2015 compliant RAMS?
Generate legally compliant Risk Assessments and Method Statements that meet CDM 2015 requirements.
Create RAMS Document - £12.99What Are the CDM 2015 Regulations?
CDM 2015 are UK legal regulations that aim to protect workers and anyone affected by construction work. They replaced the CDM 2007 regulations on 6 April 2015.
The regulations cover the entire construction process from initial design through to completion, placing specific duties on everyone involved: clients, designers, principal designers, principal contractors, contractors, and workers.
Key Changes from CDM 2007
- ✓CDM Coordinator removed: Replaced by "Principal Designer" role with clearer responsibilities
- ✓Simpler notification: Only projects lasting more than 30 days or 500 person-days need HSE notification
- ✓More client duties: Clients have greater responsibility to ensure competent contractors
- ✓Domestic clients: Principal contractor can take on client duties for domestic projects
- ✓Clearer definitions: What counts as "construction work" is more clearly defined
Who Do CDM 2015 Regulations Apply To?
CDM 2015 applies to ALL construction work, with very few exceptions. Here's how it breaks down:
Definition of Construction Work
CDM 2015 defines construction work as:
- • Building, altering, maintaining, or demolishing structures
- • Installing or removing services (electrical, plumbing, heating, etc.)
- • Painting and decorating
- • Scaffolding erection and dismantling
- • Site preparation and clearance
- • Ground works and excavations
Projects Covered by CDM 2015
Commercial Projects
Full CDM 2015 applies. All duty holders must fulfill their responsibilities.
Examples: Offices, shops, factories, schools, hospitals, public buildings
Domestic Projects (Homeowners)
Client duties transfer to contractors. Domestic clients are not expected to understand CDM, so contractors take on these responsibilities.
Examples: House extensions, loft conversions, new kitchens, rewiring homes
Mixed-Use Projects
Depends on the nature of work. If work affects commercial parts of a building, full CDM applies.
Examples: Flats above shops, work in communal areas of residential buildings
Exemptions (Very Limited)
Only a few types of work are excluded from CDM 2015:
- • Work that doesn't involve construction (e.g., pure maintenance like changing a lightbulb)
- • Domestic clients managing their own DIY work (but contractors they hire are still covered)
- • Archaeological excavations
Bottom Line:
If you're a tradesperson doing ANY construction work—commercial or domestic—CDM 2015 affects you. You have legal duties under these regulations.
Your Duties as a Contractor Under CDM 2015
Most tradespeople fall into the "contractor" category under CDM 2015. Here are your specific legal duties:
1. Plan, Manage, and Monitor Your Work
You must plan your work so it can be carried out safely, from start to finish.
Practical steps:
- • Create risk assessments and method statements (RAMS) before starting work
- • Identify hazards specific to your trade and the site
- • Plan the sequence of work to minimize risks
- • Monitor work to ensure procedures are followed
- • Adapt plans if conditions change
2. Ensure Workers Are Competent and Properly Supervised
Only use workers who have the skills, knowledge, and experience for their tasks.
Practical steps:
- • Verify qualifications (CSCS, trade cards, Gas Safe, etc.)
- • Provide task-specific training where needed
- • Supervise inexperienced workers appropriately
- • Keep records of competence (certificates, training logs)
3. Provide Information to Workers
Workers must understand the risks and how to work safely.
Practical steps:
- • Conduct site inductions covering site-specific hazards
- • Provide RAMS to your team and brief them on content
- • Explain emergency procedures and welfare facilities
- • Ensure workers know how to report hazards or incidents
4. Cooperate with Other Duty Holders
Share information and coordinate with other contractors and the principal contractor.
Practical steps:
- • Provide your RAMS to the principal contractor before starting work
- • Attend site meetings and safety briefings
- • Report hazards you identify to the principal contractor
- • Coordinate with other trades to avoid creating risks
5. Provide Welfare Facilities
Ensure workers have access to toilets, washing facilities, drinking water, and rest areas.
Practical steps:
- • Check welfare provision before starting work
- • If working alone on domestic sites, agree arrangements with the client
- • On larger sites, principal contractor usually provides facilities
- • Don't assume facilities are available—confirm beforehand
6. Report Obvious Risks
If you identify risks that affect others, report them immediately.
Practical steps:
- • Report hazards to the principal contractor or client
- • Don't assume someone else has noticed the risk
- • If immediate danger exists, stop work and alert others
- • Document reports (email or site diary entry)
Meet Your CDM 2015 Duties with Proper RAMS
Generate trade-specific, CDM-compliant documentation in minutes
Create Compliant RAMS - £12.99Principal Contractor Duties (If You Manage Multiple Contractors)
If you're the main contractor managing a project with multiple contractors, you're the principal contractor under CDM 2015. You have additional duties:
- 1.Plan, manage, and monitor the project: Coordinate all construction work to ensure it's carried out safely
- 2.Prepare the construction phase plan: Document how the work will be managed safely
- 3.Organize cooperation between contractors: Hold meetings, share information, coordinate activities
- 4.Ensure contractors provide RAMS: Review and approve before work starts
- 5.Check contractor competence: Only engage contractors with appropriate skills and resources
- 6.Provide welfare facilities: Toilets, washing, drinking water, and rest areas
- 7.Display HSE notification: If project requires notification (over 30 days/500 person-days)
- 8.Provide information to HSE: Respond to inspections and requests for documentation
Important for Domestic Work
On domestic projects (work for homeowners), the principal contractor automatically takes on the client's duties as well. This means you're responsible for ensuring the principal designer is appointed (if needed) and that pre-construction information is provided.
Common CDM 2015 Violations and How to Avoid Them
HSE inspectors frequently find these breaches during site inspections:
1. No Risk Assessments or Method Statements
Starting work without RAMS or using generic templates that don't match the actual work being done.
Fix: Create trade-specific RAMS before starting any job. They must reflect actual site conditions and work methods.
2. Incompetent or Untrained Workers
Workers lacking necessary qualifications, training, or supervision for their tasks.
Fix: Verify and record all worker competence. Maintain copies of CSCS cards, certificates, and training records.
3. Poor Coordination Between Contractors
Multiple contractors working on the same site without communicating or coordinating activities, creating overlapping risks.
Fix: Hold regular coordination meetings. Share RAMS with all contractors. Agree on sequencing to avoid clashes.
4. No Construction Phase Plan (Principal Contractors)
Principal contractors failing to create or maintain a construction phase plan.
Fix: Document site rules, emergency procedures, welfare arrangements, and how work will be coordinated. Keep it updated.
5. Inadequate Welfare Facilities
No toilets, washing facilities, or drinking water available to workers.
Fix: Confirm welfare provision before work starts. On domestic sites, agree arrangements with clients beforehand.
6. Not Reporting Notifiable Projects
Failing to notify HSE of projects lasting more than 30 working days or involving more than 500 person-days of work.
Fix: Principal contractors must submit F10 notification to HSE before work begins on notifiable projects.
How to Demonstrate CDM 2015 Compliance
When HSE inspectors visit your site or clients/principal contractors ask for evidence, you need to show:
Document Your Planning
- • Written risk assessments and method statements
- • Site-specific induction records (signed by workers)
- • Briefing records showing RAMS discussed with team
- • Inspection logs for equipment and site conditions
Prove Competence
- • Copies of CSCS or trade-specific cards
- • Certificates for task-specific training (working at height, first aid, etc.)
- • Evidence of relevant qualifications (NVQs, City & Guilds, Gas Safe, etc.)
- • Records of supervision arrangements for less experienced workers
Show Cooperation
- • Emails providing RAMS to principal contractors
- • Meeting attendance records
- • Reports of hazards shared with other duty holders
- • Agreements on work sequencing and coordination
Evidence Monitoring
- • Site diaries recording daily safety checks
- • Toolbox talk records
- • Photographs of safety measures implemented
- • Incident/near-miss reports and follow-up actions
Penalties for CDM 2015 Breaches
CDM 2015 is criminal law. Breaches can result in serious consequences:
Potential Penalties:
- Improvement Notices: Legal requirement to fix issues within set timeframe (typically 21 days)
- Prohibition Notices: Immediate work stoppage until issues resolved (stops your income)
- Fines: Unlimited for serious breaches. Average fines: £20,000-£100,000+ depending on severity
- Prosecution: Criminal record affecting future contracts and reputation
- Imprisonment: Up to 2 years for serious violations causing death or major injury
Real-world example: In 2024, a small electrical contractor received a £35,000 fine after a worker was seriously injured due to inadequate risk assessments and poor supervision. The company had no RAMS in place and couldn't demonstrate worker competence.
HSE takes CDM 2015 breaches seriously. Claiming ignorance is not a defense—you're expected to know and follow the regulations.
Stay CDM 2015 Compliant
Understanding CDM 2015 is just the start—you must demonstrate compliance with proper documentation, competent workers, and safe working practices.
- ✓Meet your legal duties as a contractor
- ✓Avoid HSE enforcement action and penalties
- ✓Win contracts with compliant documentation
- ✓Protect your workers and your business
Generate CDM 2015 Compliant RAMS
Trade-Specific • Legally Compliant • Instant Download
£12.99 per document
Create Your RAMS NowMeets all CDM 2015 requirements • Accepted by principal contractors • No subscription